Demolition contractor for Monterey and Monterey County

Request a demolition quote →
Get a Quote
Gutted room with debris on the floor during interior demolition (Monterey Demolition Pros)

Kitchen demolition in Monterey

Kitchen Demolition in Monterey

We tear out old kitchens so the remodel crew starts on open framing, with gas and water capped, the rest of the house protected and the debris gone the same day it comes out.

Kitchen Tear-Out for Monterey Remodels

Kitchens in older peninsula homes tend to be small, closed off and layered with past updates. It is common to find two or three floors stacked on top of each other, tile over plywood over linoleum, and soffits hiding old ductwork. A clean demolition takes all of that out down to the subfloor and framing so the contractor can see what they are working with.

Our scope usually covers upper and lower cabinets, countertops, backsplash, flooring layers, soffits, the range hood and appliances, and any wall the plans open up. If a wall between the kitchen and dining room is coming out, we confirm with the plans whether it is bearing before touching it. We also look at what the remodel keeps. If the new kitchen reuses the window, the range location or part of the flooring, we mark those before work starts and demolish around them by hand. Keeping one good thing intact is often worth an extra hour of careful work.

Interior stripped to the wall studs for a remodel (Monterey Demolition Pros)

Gas, Water and Electrical Before Kitchen Demolition

Before anything is pulled, the gas line to the range is shut and capped, the water supply to the sink and dishwasher is shut and capped, and the circuits feeding the kitchen are turned off at the panel. Your plumber or electrician can handle that, or we can arrange it as part of the job. Nothing is cut until the lines are confirmed dead.

Older peninsula homes sometimes have galvanized water pipe and knob-and-tube wiring hidden in kitchen walls. When we open the walls and find them, we stop and show you so your remodel contractor can decide what to replace. Replacing them during the remodel is usually cheaper than opening finished walls again later.

Asbestos in Old Kitchen Floors and Walls

Vinyl floor tile, the black mastic under it, sheet flooring backing and some joint compound and texture can contain asbestos in homes built before the 1980s. A survey is done before the kitchen is torn out. If any of those layers test positive, a certified abatement contractor removes them first, and we pick up once the area is cleared.

This is the step people most often want to skip, and it is also the one that can stop a remodel cold if an inspector finds disturbed material later. It is faster to sample first. Lab results usually come back within days, which is a small delay compared with a stop-work order in the middle of a remodel.

Older room stripped of finishes before renovation (Monterey Demolition Pros)

Kitchen Demolition on Tight Peninsula Lots

In Carmel and Pacific Grove there is often nowhere to park a bin, and in New Monterey the driveway may be too steep for one. We bring debris out in carts or bags to a small truck, make several runs a day, and keep the street clear. When a cabinet set is in good shape, it can go to reuse instead of the trash.

We lay floor protection from the kitchen to the door, seal off the rest of the house with plastic, and clean at the end of each day so the home stays livable if you are staying through the remodel. The refrigerator can often be moved and stay plugged in elsewhere so you are not living out of a cooler.

  • Floor runners from kitchen to exit
  • Plastic walls sealing off living areas
  • Daily debris runs, no bin required
  • Reusable cabinets set aside on request

What Our Kitchen Demolition Includes in Monterey

01

Cabinet and Countertop Removal

Uppers, lowers, islands, stone or tile counters and backsplash come out without tearing up the framing behind them. Stone slabs are cut and carried out in manageable pieces, and cabinets in good shape can be removed intact for reuse.

02

Flooring Removal to Subfloor

Every layer of old flooring is taken up, including tile, vinyl, underlayment and glue, leaving a clean subfloor ready for inspection. Soft or damaged subfloor sections are pointed out so the new floor system goes down on solid ground.

03

Utility Caps and Safe Shutoffs

Gas, water and power to the kitchen are shut and verified before work begins. Lines are capped and labeled so your plumber and electrician can find them, and nothing is cut until we have confirmed it is dead.

04

Same-Day Kitchen Debris Removal

Debris leaves the property as it comes out, so it never piles up in the yard or driveway. Metal from appliances and sinks goes to scrap recycling, and the floor path to the door is swept clean at the end of each day.

Kitchen Demolition: Job Site Photos

Demolition FAQs

Kitchen Demolition Questions in Monterey

How long does kitchen demolition take?

Most kitchens are torn out in one to three days, depending on size, number of flooring layers and whether walls are being opened. Plaster walls and tile set in mortar take longer than drywall and vinyl.

Do you remove appliances?

Yes. The range, refrigerator, dishwasher, hood and disposal are disconnected and hauled out, and metal is recycled. If you want to keep or sell an appliance, tell us and we will set it aside.

What affects the cost of kitchen demolition?

Kitchen size, counter material, number of flooring layers, walls coming out, how far debris has to be carried, and whether the asbestos survey finds anything. Stone counters and mortar-set tile add labor and weight.

Can I stay in the house while the kitchen is torn out?

Most people do. We seal the kitchen off, protect the path to the door, and clean up daily. You will lose the use of the kitchen and possibly water to that area for a few days.

Do I need a permit for kitchen demolition?

The remodel permit generally covers it. If walls, gas or electrical are being changed, the permit should be issued before we start. We can work from your contractor's permit and approved plans.

Green debris container staged on a street (Monterey Demolition Pros)

Demolition quote

Get a Kitchen Demolition Quote in Monterey

Tell us the size of the kitchen and what is coming out. We reply within 24 hours by phone or email, and may ask for photos when we follow up.

  • Permits
  • Demolition
  • Haul-off

Request a Demolition Quote

Tell us about the job. We reply within 24 hours.

We will reach out via phone or email within 24 hours.

Get a Demolition Quote